DESK PROCESSING OF LEVELING MATERIALS
Keywords:
Measurement, level, office, accuracy formulas, crane, polygons, accuracy, reference points, site, field land, construction sites, conditional measurements.Abstract
This article shows the plane of construction site construction and its exact leveling. As well as recalculating the accuracy of leveling construction sites. The lines of cranes installed on columns along which the crane tracks run should not be included in the main leveling moves, since they are under the influence of variable load from the operating crane.